Engineered oak flooring
The most specified floor in Sydney right now, and for good reason — real timber wear layer, far more dimensional stability than solid, and it suits apartments.
Read moreService
Hard flooring in a NSW apartment is an acoustic and approval problem before it is a flooring problem. This is the part almost nobody explains properly.

Every year owners across Manly, Dee Why, Neutral Bay, Cremorne, North Sydney and Bondi install a floor, receive a complaint from the lot below, and discover their building had an acoustic requirement they were never told about. NCAT has ordered non-compliant floors removed at the owner’s cost.
It is entirely avoidable. The requirements are published, the approval pathway is set out in legislation, and the paperwork is straightforward once you know what is being asked for. We treat that as part of the job.
First, the National Construction Code. For a floor separating one apartment from another, NCC 2022 Part F7 requires impact sound insulation of L′nT,w ≤ 62 and airborne insulation of Rw + Ctr ≥ 50, determined under AS ISO 717.2. That is the legal floor, not a target.
Second — and this is the one that actually catches people — your building’s own by-law. Most NSW schemes set a stricter requirement than the Code, expressed as an AAAC star rating. The NSW model by-law on floor coverings requires an owner to ensure all floor space in the lot is covered or treated enough to prevent noise likely to disturb another lot, excluding the kitchen, laundry, lavatory and bathroom.
| AAAC rating | Impact sound (L′nT,w) |
|---|---|
| 2 Star | below 65 dB |
| 3 Star | below 55 dB |
| 4 Star | below 50 dB |
| 5 Star | below 45 dB |
| 6 Star | below 40 dB |
Under section 110 of the Strata Schemes Management Act 2015 (NSW), removing carpet or other soft floor coverings to expose or install hard flooring is expressly prescribed as a minor renovation. That matters, because a minor renovation needs approval by ordinary resolution at a general meeting — not the special resolution and by-law that section 108 works require. Approval may be given subject to reasonable conditions, and it cannot be unreasonably withheld. Many schemes delegate the decision to the strata committee.
In practice this means a written application with the right attachments, and typically two to four weeks for a decision.
Underlay ratings are laboratory figures, measured on a specific test slab with a specific build-up. Your building is not that slab. Concrete thickness, the ceiling treatment in the lot below, service penetrations and cavities all change the real result, sometimes substantially.
So a product rated 6 star in a lab is not automatically 6 star in your apartment, and only on-site testing after installation confirms actual performance. We say this out loud because being surprised by it later is expensive — and because a contractor who promises a lab number as an installed guarantee is telling you something they cannot know.
We check your by-law before specifying anything, propose a floor build-up with documented acoustic performance, and put together the application pack so you can submit it. Then we work to the building’s access rules, protect the common areas, and keep to the permitted hours.
| NCC 2022 Part F7 | Impact L′nT,w ≤ 62 and airborne Rw + Ctr ≥ 50 between sole-occupancy units |
|---|---|
| Test method | AS ISO 717.2 |
| Typical by-law requirement | AAAC 4 star or better; stricter schemes require 5 or 6 star |
| Approval | s110 minor renovation — ordinary resolution, not a special resolution |
| Typical timeframe | 2–4 weeks from submission to decision |
| Products used | Floating engineered oak or hybrid over rated acoustic underlay |
Related work




Questions
Yes. Removing carpet to install or expose hard flooring is prescribed as a minor renovation under section 110 of the Strata Schemes Management Act 2015, which requires approval by ordinary resolution at a general meeting. It does not require a special resolution or a new by-law. Approval can carry reasonable conditions but cannot be unreasonably withheld, and many schemes delegate the decision to the strata committee.
At minimum, the NCC 2022 Part F7 figures: impact sound L′nT,w of 62 or less and airborne Rw + Ctr of 50 or more. Most strata by-laws set something stricter, usually expressed as an AAAC star rating of 4 star (below 50 dB) or better, with some buildings requiring 5 or 6 star. Check your specific by-law — it overrides the general assumption.
They are impact sound ratings, measured as L′nT,w in decibels, where a lower number means less noise transmitted to the apartment below. 4 star is below 50 dB, 5 star is below 45 dB, and 6 star is below 40 dB. 6 star is achievable in most apartments with a high-performance acoustic underlay system, though the result always depends on the building as well as the underlay.
Typically two to four weeks from submitting a complete application. The main delay is usually the meeting cycle rather than the decision itself, since approval is by ordinary resolution at a general meeting, though many schemes delegate it to the strata committee which can be faster. Submitting a complete pack first time is the single biggest thing that speeds it up.
It is generally discouraged and often not permitted. Solid timber direct-fixed to a concrete slab transmits impact noise far more readily than a floating system, and it is difficult to meet a 5 or 6 star by-law with it. The practical solutions for apartments are floating engineered timber over a rated acoustic underlay, or hybrid flooring with an acoustic backing.
No, and be cautious of anyone who says it will. Underlay ratings come from laboratory tests on a specific slab and build-up. Your building’s slab thickness, the ceiling treatment below, and any cavities or service penetrations all affect the real result. A lab figure is a strong indicator, not a guarantee — only on-site testing after installation confirms actual performance.
Also relevant
The most specified floor in Sydney right now, and for good reason — real timber wear layer, far more dimensional stability than solid, and it suits apartments.
Read moreWaterproof, hard-wearing and quieter underfoot than laminate — the sensible answer for wet areas, rentals, holiday houses and anywhere with kids and dogs.
Read moreBringing tired, dark, scratched floorboards back to raw timber and finishing them properly — with dust extraction that keeps the rest of the house liveable.
Read moreFree measure & quote